Learn more about other Climate Control Group companies, TERMS & CONDITIONS | PRIVACY POLICY | EMPLOYMENT OPPORTUNITIES, COPYRIGHT © 2011 - 2018 CLIMATEMASTER, INC. ALL RIGHTS RESERVED. 2. E . Vertical Discharge Air Kit Base 4 BAYVDTA004 Auto Charge Solenoid Kit BAYCAKT001 Refrigerant Lineset ⑤ ① Certified in accordance with the Air-Source Unitary Heat Pump Equipment certification program which is based on AHRI Standard 210/240. EATCHIP. piper aircraft, inc. pa-46-500tp, malibu meridian maintenance manual max weight 5 lbs (2.2 kg) attention this air conditioning system serviced with hfc-134a refrigerant. Install Manual. Since the details are inherently graphical in nature, they are not readable by a screen reader. Electron Beam. TOV. Portail des communes de France : nos coups de coeur sur les routes de France. All rights reserved. We offer a wide range of products, including information displays, digital signage for advertising, commercial system air conditioners, VRF systems & tailored solutions for different vertical markets. It is a form typically characterized by a single building with open arcade on the ground floor where the market took place. (Registration Required), Survivors Education & Assistance Benefits (Chapter 35), Veterans Education Assistance Program (VEAP), Veterans Information Portal (WebLGY) (Registration Required), Service Members' Group Life Insurance (SGLI), Family Servicemembers' Group Life Insurance (FSGLI), Servicemembers' Group Life Insurance Traumatic Injury Protection (TSGLI), Service-Disabled Veterans Insurance (S-DVI), Batteries (for Hearing Aids & Other Devices), Manage Your Prescriptions at Your Local VA Medical Center, Manage Your Prescription Refills with My HealtheVet (Registration Required), Health (Please contact your local VA Medical Center), Track Your Appointments with My HealtheVet (Registration Required), Domiciliaries (Please contact your local VA Medical Center), Talent Management System (TMS) (Registration Required), VA Learning University (VALU) (Registration Required), Direct Deposit Sign-Up Form SF 1199A (PDF), Personal Identification Verification (PIV) Card, Security Investigation Center/Background Investigations, Security Investigation Center/Background Clearances, Freedom of Information Act (FOIA)/Privacy Act Requests, 21–4138 — Statement in Support of Claim (PDF), 22–1995 — Request for Change of Program or Place of Training (PDF), 21–526 — Application for Compensation and/or Pension (PDF), 22–1990 — Application for Education Benefits (PDF), 21–2680 — Exam for Housebound Status or Permanent Need for Regular Aid and Attendance (PDF), 10–10ez — Application for Health Benefits, 21–534 — Application for Dependency & Indemnity Compensation (DIC), Death Pension & Accrued Benefits by a Surviving Spouse or Child (PDF), Office of Construction & Facilities Management, Office of Acquisition, Logistics and Construction (OALC), Office of Small and Disadvantaged Business Utilization (OSDBU), Office of Asset Enterprise Management (OAEM), All Architectural Details in AutoCAD format, Ambulance Entrance Details for Head-In or Drive-Thru Unloading, Ambulance Entrance Details for Back-In Unloading, Trapeze, Exercise Bar and Patient Helper Suspension, Pipe/Duct Penetration of Smoke/Fire Barriers, Door Schedule, Legend, Notes, and Modifications, Pharmacy Service Window and Package Transfer -, Notes for Air Cooled Refrigeration System, Notes for Water Cooled Refrigeration System, Medicine Cabinet Type 18C, Sizes 1, 2, 3, and 4, Support System for Ceiling Mounted X-ray Equipment, DOD/VA Universal X-Ray, (R-F) Room Equipment Raceway Layout Scheme 1 and 2, DOD/VA Universal X-Ray, Ceiling Mounted X-Ray Equipment, Hoistway Details: Passenger Elevator 4,000 lb Capacity (Two Speed Sliding Doors), Entrance Details: Service and Passenger Electric Traction or Hydraulic Elevator (Two Speed Sliding Doors), Service Elevator: 5,000 lb Capacity (Horizontal Sliding Center Opening Doors), Entrance Details: Service and Passenger Electric Traction or Hydraulic Elevator (Horizontal Sliding Center Opening Doors), Elevator Hoistway Vertical Dimensions: 4,000 lb Capacity, Elevator Hoistway Vertical Dimensions: 5,000 lb Capacity, Passenger Elevator: (Horizontal Sliding Center Opening Doors), Entrance Details: Service and Passenger Electric Traction or Hydraulic Elevator (w/Drywall Shaft and Horizontal Sliding Center Opening Doors), Summary of Modifications in December 2015 Update, Summary of Modifications in September 2020 Update, Pipe Penetration Through Walls Below Grade, Plumbing Abbreviations (separate in PDF, combined in DWG), Plumbing Abbreviations (separate in PDF, combined in DWG), Drawing Symbols (separate in PDF, combined in DWG), Plumbing Piping Symbols (separate in PDF, combined in DWG), General Plumbing Symbols (separate in PDF, combined in DWG), Plumbing Valve Symbols (separate in PDF, combined in DWG), Flushing Rim Floor Drain "L" Cystoscopy Room, Connections to Domestic Water Booster Heater, P-112 Water Closet - (Gero-Psych) Sensor Operated, P-505 Clinic Service Sink Rough-In Detail, P-519 Surgeons Scrub Sink - Single Compartment -, P-810 Steam and Water Mixing Valve Detail, Medical Gas Alarm Panel Schedule, Continued, Summary of Modifications in November 2020 Update, HVAC and Steam Equipment Schedules (2017-12 revisions noted in the schedule file), Designer's Notes for Details and Schedules, Support Anchor (Condenser Water or Chilled Water), Anchor Installation - Steam/Condensate Piping in Trench, Piping Crossing A Seismic Joint Detail "A", Piping Crossing A Seismic Joint Detail "B", Piping Crossing A Seismic Joint Detail "C", Piping Crossing A Seismic Joint Detail "D", Piping Crossing A Seismic Joint Detail "E", Forces and Moments on Boiler Steam Nozzles, Steam Flow Meter Primary Element and Flow Transmitter Installation, Burner Control Panel For Water Tube Boiler, Air System for Airborne Infection Isolation Room (AII) (With Anteroom), Air System for Airborne Infection Isolation Room (AII) (Without Anteroom), HEPA Filter Controls For Autopsy Exhaust Systems, VAV Air Handling Unit With Min OSA Control Diagram, Sequence of Operation For VAV Air Handling Unit with Min OSA, Points List for VAV Air Handling Units with Min OSA, Air Handling Unit for Surgical Suite (VAV), Sequence of Operation for AHU for Surgical Suite (VAV), Air System for Protective Environment Room (PE) (With Anteroom), Air System for Protective Environment Room (PE) (Without Anteroom), Air System for Combination Airborne Infection Isolation (AII)/ Protective Environment (PE) Room with Negative Anteroom, Air System for Combination Airborne Infection Isolation (AII)/ Protective Environment (PE) Room with Positive Anteroom, Underground Fuel Oil Storage Tank 8,000 Gallons and Larger, Steam Trap Assembly and Steam Line Drip Pocket, Standard Steam Boiler Plant Piping Diagram, Basic Flow Diagram - Condensate and Boiler Feedwater, Condensate Storage and Transfer Flow Diagram, High and Medium Pressure Steam Trap Discharge Into Pumped Condensate Return Line, Tubing, Piping, and Conduit Passing Through Pre-Fab Insulated Wall Panels, Horizontal Expansion Tank - Piping Connections, Floor Mounted Expansion Tank - Piping Connections, Indirect Glycol Make-Up System (Piping and Control), Drain Valve and Air Vent Connections (Hydronic Systems), Dual Heat Exchanger Controls (Heating System), Terminal Unit Water Coils - Piping Connections, Mobile Indirect Glycol Make-up System (Piping and Controls), Single Suction Floor - Mounted Pumps Connections with Flexible Connectors, Single Suction Floor Mounted Pumps - Connection with Mechanical Couplings, Double Suction Floor Mounted Pumps - Connections with Flexible Connector, Double Suction Floor Mounted Pumps - Connections with Mechanical Couplings, Horizontal Split Case Pump - Flexible Connectors, Steam Pressure Reducing Station - Double Valve (1/3 AND 2/3), Float and Thermostatic Steam Trap Assembly, Steam Humidifier - Piping Connections (Multiple Dispersion Tubes), Water Filter - Closed Loop Hydronic System, Ductwork Transitions (with Equipment Mounted in Duct), Alternate Supply Duct Takeoff - Air Terminal Units, HEPA Filter Sizing Chart 7 Surgical Room Section A-A, Fan Powered Air Terminal Unit Control Diagram, Air Terminal Units with HEPA Filter BMT Suite, Positive Isolation Rooms, Air Terminal Units with HEPA Filter Operating And Cystoscopy Rooms, Compressed Air System Standard Piping Diagram, Water Sample Coolers - Boiler Water and Feedwater, Continuous Blowdown Heat Recovery Standard Piping Diagram, Typical Drain for Air Compressor and Dryer, Anchoring Equipment Packaged Boiler and Deaerator and Condensate Storage Tanks, Access Platform Arrangement For Water Tube Boiler, Access Platform Arrangement For Fire Tube Boiler, Natural Gas and Liquefied Petroleum Gas Burner and Igniter Fuel Standard Piping Diagram, No.